Our driveway has needed resurfacing for the past few years and we finally decided to "get her done"! The equipment arrived about 8:30 followed by the crew. They did the prep work and then left to prepare two other driveways in the neighborhood. By 1:30 they were back with a load of asphalt, spread it and rolled it and by 2:15 we had a new driveway. The crew then headed down the street to finished their other two jobs. That is a lot of hot, hard work for a day!
Subscribe to:
Post Comments (Atom)
4 comments:
That is not a job I would enjoy on a hot summer's day! At least there were quite a few working together to get it done fast.
Definitely not what I would want to do on a hot day either, but the good thing is all the trees at least offered some shade! Always good to get the job done though! Enjoy your week, Lew -- and your new driveway! It does look great!
Sylvia
i didn't know it's quite fast to do this. our driveway needs some resurfacing, too.:p
It makes me tired just looking at the photos. It seems like they did a good job, and you documented it very well. Thanks for sharing.
Post a Comment